skill-cost-projections
- Repo stars 3,406
- Author updated Live
- Author repo claude-octopus
- Domain
- AI
- Compatible agents
-
- Claude Code
- Cursor
- Cline
- Codex
- Windsurf
- Gemini CLI
- +20
- Trust score
- 88 / 100 · community maintained
- Author / version / license
- @nyldn · no license declared
- Token usage
- Lean
- Setup complexity
- Guided setup
- External API key
- Not required
- Operating systems
- Unspecified (assume cross-platform)
- Runtime requirements
- No special requirements
- Permissions
-
- Read-only
- Shell exec
- Env read
- Write / modify
- Network behavior
- Local-only
- Install commands
- 26 variants
Profile is derived at build time from SKILL.md and install vectors. Subject to drift from author intent.
Heads up: 未限定 allowed-tools,默认拥有全部工具权限。
---
name: skill-cost-projections
description: Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns Proje…
category: ai
runtime: no special runtime
---
# skill-cost-projections output preview
## PART A: Task fit
- Use case: Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns Projects remaining workflow cost based on per-phase averages from completed work. Displays cost data in the HUD/statusline and warns when projected totals exceed a configured budget ceiling. runs entirely locally. Works with Claude Code, Cursor, Cline and 23 more..
- Inputs: target material, constraints, expected output, and acceptance criteria.
- Evidence boundary: follow “Overview / Step 1: Collect Completed Phase Costs / Step 2: Compute Average Cost Per Step” and do not present inference as author intent.
## PART B: Execution result
- **01** The card summarizes the use case; runtime output centers on “Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns Projects remaining workflow cost based on per-phase averages from completed work. Displays cost data in the HUD/statusline and warns when projected totals exceed a configured budget ceiling. runs entirely locally. Works with Claude Code, Cursor, Cline and 23 more.”.
- **02** When the source has headings, the agent prioritizes “Overview / Step 1: Collect Completed Phase Costs / Step 2: Compute Average Cost Per Step” so the result follows the author’s structure.
- **03** Typical output includes task judgment, concrete steps, required commands or file edits, validation, and follow-up options.
- **04** Risk context follows the fingerprint: read files, run shell commands, read environment variables, write/modify files; mostly runs locally; usually needs no extra API key.
## Running Rules
- read files, run shell commands, read environment variables, write/modify files; mostly runs locally; usually needs no extra API key.
- Validate with a small sample before expanding scope.
- Return the result, validation criteria, and next iteration options. The source mentions slash commands such as `/octo`; use them first when your agent supports command triggers.
Name target files or source material, expected output, forbidden changes, and whether network or shell access is allowed. Permission fingerprint: read files, run shell commands, read environment variables, write/modify files.
Start with a small task and check whether the result follows “Overview / Step 1: Collect Completed Phase Costs / Step 2: Compute Average Cost Per Step”. Inspect diffs, logs, previews, or tests before expanding scope.
Confirm the final output includes a concrete result, evidence, and next action. If it stays generic, tighten inputs, boundaries, and acceptance criteria.
---
name: skill-cost-projections
description: Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns Proje…
category: ai
source: nyldn/claude-octopus
---
# skill-cost-projections
## When to use
- Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns Projects remaining workflow…
- Use it when the task has clear inputs, repeatable steps, and validation criteria.
## What to provide
- Target material, scope, expected result, and forbidden changes.
- Whether network, commands, file writes, or external services are allowed.
## Execution rules
- Organize steps around “Overview / Step 1: Collect Completed Phase Costs / Step 2: Compute Average Cost Per Step” and keep inference separate from source facts.
- read files, run shell commands, read environment variables, write/modify files; mostly runs locally; usually needs no extra API key.
- Validate with a small sample before expanding the task.
## Output requirements
- Return the deliverable, key evidence, validation method, and next action.
- Mark missing information as unknown; do not invent commands, platforms, or dependencies. The author source anchors workflow facts; repository files anchor sources and commands; Fluxly only adds fit, limitations, and quality judgment.
skill "skill-cost-projections" {
input -> user goal + target files + boundaries + acceptance criteria
context -> Overview / Step 1: Collect Completed Phase Costs / Step 2: Compute Average Cost Per Step
rules -> SKILL.md triggers / order / output contract
runtime -> no special runtime | read files, run shell commands, read environment variables, write/modify files | mostly runs locally
guardrails -> usually needs no extra API key + small-sample validation + diff/log review
output -> copyable result + checklist + next iteration
} Host: Codex CLI — This skill was designed for Claude Code and adapted for Codex. Cross-reference commands use installed skill names in Codex rather than
/octo:*slash commands. Use the active Codex shell and subagent tools. Do not claim a provider, model, or host subagent is available until the current session exposes it. For host tool equivalents, seeskills/blocks/codex-host-adapter.md.
Cost Projections Skill
Overview
Projects remaining workflow cost based on per-phase averages from completed work. Displays cost data in the HUD/statusline and warns when projected totals exceed a configured budget ceiling.
Minimum data requirement: Needs 2+ completed steps before projecting. With fewer than 2 data points, the average is unreliable — display actual spend only and skip projection.
Step 1: Collect Completed Phase Costs
Read cost data from ~/.claude-octopus/metrics/ or from metrics-tracker.sh output. Each completed phase/step should have an associated cost entry.
# Read metrics from the session metrics directory
METRICS_DIR="$HOME/.claude-octopus/metrics"
SESSION_METRICS="$METRICS_DIR/session-$(date +%Y%m%d).jsonl"
# Each line contains: {"phase": "discover", "cost": 0.42, "tokens_in": 12000, "tokens_out": 3400, "timestamp": "..."}
# Sum costs from completed steps
completed_costs=$(jq -s '[.[].cost]' "$SESSION_METRICS")
completed_count=$(jq -s 'length' "$SESSION_METRICS")
total_spent=$(jq -s '[.[].cost] | add' "$SESSION_METRICS")
Data sources (in priority order):
~/.claude-octopus/metrics/session-*.jsonl— structured per-phase cost entriesmetrics-tracker.shoutput — fallback for legacy sessions- HUD accumulated cost counters — last resort
If fewer than 2 completed steps are available, display only actual spend:
💰 Spent: $0.42 (1 step complete — need 2+ for projection)
Step 2: Compute Average Cost Per Step
Calculate the mean cost across all completed steps.
avg_cost=$(echo "$total_spent / $completed_count" | bc -l)
Formula:
avg_cost = total_cost / completed_steps
Example: If 3 steps cost $0.30, $0.50, $0.40 → avg = $1.20 / 3 = $0.40/step
Step 3: Project Remaining Cost
Multiply the average cost per step by the number of remaining steps.
remaining_steps=$((total_steps - completed_count))
projected_remaining=$(echo "$avg_cost * $remaining_steps" | bc -l)
projected_total=$(echo "$total_spent + $projected_remaining" | bc -l)
Formula:
projected_remaining = avg_cost × remaining_steps
projected_total = total_spent + projected_remaining
Step counts by workflow type:
| Workflow | Total Steps | Example Phases |
|---|---|---|
| embrace | 4 | Discover, Define, Develop, Deliver |
| research | 3-7 | Per-agent probe count |
| review | 3 | Fleet, Verifier, Synthesis |
| debate | 3 | Opening, Rebuttal, Synthesis |
Step 4: Display in HUD
Format the cost projection for the HUD/statusline display.
Standard display:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
Format rules:
- All dollar amounts to 2 decimal places
- Projected total prefixed with
~to indicate estimate - Use
💰prefix for the cost line - Show in a single compact line for statusline integration
When insufficient data (< 2 steps):
💰 Spent: $0.42 (need 2+ steps for projection)
Integration: This display line is emitted by the octopus-hud hook and rendered in the statusline alongside phase progress and provider status.
Step 5: Budget Ceiling Warning
If the OCTO_BUDGET_CEILING environment variable is set, compare the projected total against it and warn on overrun.
if [[ -n "${OCTO_BUDGET_CEILING:-}" ]]; then
ceiling="$OCTO_BUDGET_CEILING"
if (( $(echo "$projected_total > $ceiling" | bc -l) )); then
overage=$(echo "$projected_total - $ceiling" | bc -l)
echo "⚠️ Budget ceiling: \$$ceiling — projected to exceed by \$$overage"
fi
fi
Display when over budget:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
⚠️ Budget ceiling: $5.00 — projected to exceed by $1.00
Display when within budget:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
✅ Within budget ceiling: $10.00
Note: OCTO_BUDGET_CEILING is optional. When unset, no ceiling check is performed.
Step 6: Profile Suggestion
If the projected total is high relative to the task, suggest switching to the budget profile to reduce costs.
# Suggest budget profile when projected total exceeds $5.00 (configurable)
COST_THRESHOLD="${OCTO_COST_THRESHOLD:-5.00}"
if (( $(echo "$projected_total > $COST_THRESHOLD" | bc -l) )); then
echo "💡 Tip: Switch to OCTO_PROFILE=budget to reduce costs"
fi
Display:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
💡 Tip: Switch to OCTO_PROFILE=budget to reduce costs
The budget profile (OCTO_PROFILE=budget) routes to cheaper models and reduces agent count to minimize spend.
Complete Display Examples
Normal — within budget, moderate cost:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
Over budget ceiling:
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
⚠️ Budget ceiling: $5.00 — projected to exceed by $1.00
💡 Tip: Switch to OCTO_PROFILE=budget to reduce costs
Early in workflow (insufficient data):
💰 Spent: $0.42 (need 2+ steps for projection)
Low cost — no warnings:
💰 Spent: $0.80 | Est. remaining: $0.80 | Total: ~$1.60
Integration
With octopus-hud hook
The cost projection line is rendered as part of the HUD statusline output, updated after each phase completes.
With metrics-tracker.sh
Reads per-phase cost data written by the metrics tracker. Each completed phase logs cost, token counts, and provider details.
With OCTO_PROFILE
When OCTO_PROFILE=budget is active, the projection accounts for reduced per-step costs from cheaper model routing.
Error Handling
No metrics directory:
💰 Cost projection unavailable — no metrics data found
Corrupted metrics data: Skip malformed entries and project from valid data only. If no valid entries remain, show unavailable message.
Zero remaining steps: When all steps are complete, show final total only:
💰 Final cost: $4.80 (4 steps)
Decide Fit First
Design Intent
How To Use It
Boundaries And Review